![]()
NEW CABLEWAY CONSTRUCTION in ZAHRADKY resort
cableway name ZAHRADKY - PRIEHYBA type: 6-seated cableway 6-CLD-B manufacturer: DOPPELMAYR GMbH - Wolfurt
18th -19th of December LAUNCHING into the OPERATION!!! There were extremely windy conditions in the resort on Sunday, the 19th of December.
18th -19th of December LAUNCHING into the OPERATION!!! Endurance testing of cable car has been successfully completed on 2nd of December 2010! Cable car passed the tests and it was transporting 12 tonne load between Zahradky and Priehyba.
capacity: 2400 people/hour down station: 1038,30 m a.s.l. top station: 1379,30 m a.s.l. difference in altitude: 341 m length: 1285,16 m velocity: 5 m/s ride time: 4,69 min.
beginning of construction: May 2010 opening: on December 2010 investor: Tatry mountain resorts, a.s. amount of investment: 6 million €
A new cableway is replacing ski lift ZAHRADKY - PRIEHYBA marked as E, WHAT YOU MAY FIND INTERESTING ABOUT THE NEW CABLEWAY: • It has a three times higher transport capacity than the original ski lift (higher of 1600 persons per hour) not acceptable wind speed: 18m/s (depending on environment) and that the cable car is built in forest zone and 1/3rd without, but with weights for greater stability in windy days
By building the first track part Zahradky – Priehyba we start to fill the dream of most skier about comfortable connection between northern part of Chopok with south.
a few photos from construction > engineering characteristic of cableway (pdf 85 kB)> ![]() ![]() |